University of Virginia Facilities Management Records: Reports About University Sites and Facilities
Scope and Contents
Box 1: University of Virginia development plan / Sasaki, Walker and Associates, Inc. -- University of Virginia historic central grounds landscape study. -- University of Virginia comprehensive development plan / Land Design/Research, Inc. -- University of Virginia west side stormwater management master plan, volume II / Judith Nitsch Engineering, Inc. -- Bicycle master plan, University of Virginia / Office of the Architect. -- -- University of Virginia Intramural/Recreational Sports master plan: excerpts for the Master Planning Council / Parkin Architects/Shank and Gray Architects with Ira Fink & Associates, The Sports Management Group. -- University of Virginia parking and transportation study final report / Chance Management Advisors, with Walker Parking Consultants/Engineers and COMSIS Corporation. -- Meadow Creek drainage study and Preliminary draft Moore’s Creek watershed study. -- Rock Creek stream valley master plan: stream rehabilitation and storm drainage improvements / The Cox Company.
Box 2: Binder of projects associated with Facilities Master Plan, 1992-1994 kept by Warren (Tom) Leback, Office of the Architect. -- Archaeological investigations on historic East Street, East Range, Central Grounds / Benjamin P. Ford. -- Archaeological research at Pavilion VII yard and Poe Alley / Artifactory, M. Drake Patten, Benjamin Ford. -- University of Virginia archaeological mitigation of the Academical Village Lawn irrigation installation project / submitted by Rivanna Archaeological Consulting ; author and project director Benjamin P. Ford. -- Report on nondestructive testing and inspection of pavilion and colonnade decks, University of Virginia / prepared by Whitlock Dalrymple Poston & Associates, Inc. -- Draft final report on nondestructive testing and inspection of pavilion and colonnade decks, University of Virginia / prepared by Whitlock Dalrymple Poston & Associates, Inc. -- Jefferson Park Avenue circulation study Charlottesville / University of Virginia Office of the Architect, City of Charlottesville Neighborhood Planning and Development Services. -- University of Virginia Arts Precinct conceptual design / William Rawn Associates. -- Traffic study, University of Virginia Maywood connector analysis / Kimley-Horn and Associates, Inc. -- University of Virginia energy and utilities master plan update final / Carter-Burgess. -- University of Virginia historic preservation framework plan / Mesic Cohen Wilson Baker, Architects. -- Targeting excellence : University of Virginia restructuring report.
Dates
- Creation: Majority of material found within 1982 - 2015
Biographical / Historical
Facilities Management supports the University of Virginia’s wide range of research, academic and patient care programs. With over 1,200 employees dedicated to excellence, Facilities Management is responsible for the day-to-day operation, repair and maintenance of UVA’s buildings, infrastructure and grounds as well as other University-owned and leased properties.
Extent
2 Cubic Feet (2 cubic feet (2 cubics))
Language of Materials
English
Arrangement
BOX 1:
University of Virginia Historic Central Grounds Landscape Study
University of Virginia Development Plan
1985 Meadow Creek Drainage Study & Preliminary Draft Moore’s Creek Watershed Study
Bicycle Master Plan University of Virginia
UVa Intramural/Recreational Sports Master Plan
UVa Parking and Transportation Study – Final Report
University of Virginia Comprehensive Development Plan
UVa West Side Stormwater Management Master Plan Volume II
Rock Creek Stream Valley Master Plan; Stream Rehabilitation & Storm Drainage Improvements
BOX 2:
3-ring binder of projects associated with Facilities Master Plan
Archaeological Investigations – Historic East St, East Range, Central Grounds
Archaeological Research at Pavilion VII Yard and Poe Alley
Archaeological Mitigation – Academical Village Lawn Irrigation Installation
Report on Nondestructive Testing and Inspection of Pavilion and Colonnade Decks
Draft Final Report on Nondestructive Testing and Inspection of Pavilion and Colonnade Decks
Jefferson Park Avenue Circulation Study
University of Virginia Arts Precinct Conceptual Design
Traffic Study - Maywood Connector Analysis
Energy and Utilities Master Plan Update Final
University of Virginia Historic Preservation Framework Plan
Targeting excellence: University of Virginia restructuring report
- Title
- University of Virginia Facilities Management Records: Reports About University Sites and Facilities
- Status
- Completed
- Author
- Modified by Ellen Welch
- Date
- 2025-04-21
- Description rules
- Describing Archives: A Content Standard
- Language of description
- English
- Script of description
- Latin
Repository Details
Part of the Albert and Shirley Small Special Collections Library Repository
Albert and Shirley Small Special Collections Library
P.O. Box 400110
University of Virginia
Charlottesville Virginia 22904-4110 United States