Dept. L: Energy Projects, 1/1/1984-12/31/1991
Scope and Contents
SBIR Hearing-House 11/26/1991; Enhanced Modular Signal Processor (UYS-2); Camp Picket/A. P. Hill Realignment; Congressional Monitor; Assault Weapons; Closed Cases; Closed Cases; Canadair Challenger Briefing [binder]; 10/29/1991 Hearing/SB and Kuwait; Base Closure- Credit Union; Navy Consolidation GSA; Miscellaneous; VA Forum Speech 11/14/1991; Loose Correspondence regarding General Dynamics; Army Corps Reorganization; GSA/Navy Building Procurement; CIA Relocation; Navy Consolidations
Dates
- Creation: 1/1/1984-12/31/1991
Creator
- From the Series: Warner, John W., 1927- (Person)
Language of Materials
English
Access Restrictions
This series is open for use.
Physical Access
Items on digital or audio-visual carriers will need to be evaluated on a case-by-case basis before digital tranfer occurs. Allow at least two weeks for the evaluation phase. Digitzation may take between two and four weeks.
Extent
From the Series: 713 Cubic Feet (Cubic foot boxes)
Repository Details
Part of the Albert and Shirley Small Special Collections Library Repository
Albert and Shirley Small Special Collections Library
P.O. Box 400110
University of Virginia
Charlottesville Virginia 22904-4110 United States